After you configure a data integration task, you can stop, resume, or delete the task.
Prerequisites
A data integration task is created. For more information, see Configure a data integration task between ApsaraDB RDS for MySQL instances.Background information
The following table describes the operations that you can perform and the impact of each operation.
Operation | Impact |
Stop Task | The status of the data integration task changes to Paused. The scheduling stops. Note After you pause a data integration task, you can resume the task if necessary. |
Resume Task | The status of the data integration task changes to Running or Ready. The scheduling resumes. DTS generates a data migration task based on the scheduled time. |
Delete Task | The status of the data integration task changes to Deleted. The task is no longer scheduled. Warning After you delete a data integration task, you can no longer resume the task. Perform this operation with caution. |
Procedure
- Log on to the DTS console.
- In the left-side navigation pane, click Data Integration.
- At the top of the page that appears, select the region where the destination instance resides.
- Find the data integration task and click the instance ID.
Find the data integration task and click Stop Task.
In the message that appears, click OK.
You can resume or delete a data integration task that is in the STOPPED state.
To resume a data integration task, click Resume data integration task. In the message that appears, click Confirm.
To delete a data integration task, click Delete Task for data integration task. In the message that appears, click Confirm.